2010
Managed realignment
United Kingdom
Thames Estuary (Essex)
0.4465
51.5028
Mudflat
27 Hectares
Compensation
For this project the existing flood defence was breached (breach width c.320m).
As part of this scheme the topsoil was stripped; field level reduced by c. 0.5m (i.e. excavation) and a new flood defence created to rear.