Glasson

Year Implemented

2005

Project Type

Regulated tidal exchange

Country

United Kingdom

Location

Conder (Lancashire)

Longitude

-2.8292

Latitude

53.9942

Habitat(s) Created
  • Lagoon

Size

6.4 Hectares

Why Undertaken
  • Reduce Flood Protection Costs

Project Description Summary

For this project, initially in 2002 a high-level breach was made before the RTE was done in 2005. The RTE involved 1 pipe : 0.6m diameter (under road, no gradient); 2 sill breaches: ~10m each (without pipe, site was flooded <10 times per year through these) . As part of this scheme there was some reshaping according to ecologist's design

Documents/References uploaded
References
  • Cunningham, R., Davis, R., Dickie, I., Kemp, J., 2005. Saltmarsh: Restoration Requirements under the Water Framework Directive. RSPB, Sandy, 47p.