Poole Harbour (Parkstone Yacht Club)

Year Implemented

1995

Project Type

Beneficial use of dredged sediment

Country

United Kingdom

Location

Poole Harbour (Dorest)

Longitude

-1.9614

Latitude

50.7101

Habitat(s) Created
Size

0.65 Hectares

Why Undertaken
Project Description Summary

Existing intertidal sediments and dredged silts and sands were placed within a rubble mound breakwater and sheet piling.

Documents/References uploaded
References
  • ABP Research and Consultancy Ltd, 1999. Experimental design for trial intertidal recharge. Report No. R.802. January 1999.