1995
Managed realignment
United Kingdom
Blackwater Estuary (Essex)
0.8677
51.7197
Mudflat
Saltmarsh
38 Hectares
Reduce Flood Protection Costs
Improve Flood Protection
Create a More Natural Shoreline
This project involved two breaches (50 and 40m wide). As part of this scheme artificial creeks were dug (excavated material used for temporary wave breaks), a pond was also excavated.