2006
Managed realignment
United Kingdom
Aln (Northumberland)
-1.6222
55.3911
Saltmarsh
8 Hectares
Reduce Flood Protection Costs
This project involved two breaches (270m wide in total), with one drainage pipe left in place (flap removed). As part of this scheme two scrapes were dug.