2002
Managed realignment
Germany
Weser (Bremen)
8.4856
53.2151
Lagoon
Reedbed
34 Hectares
Compensation
This involved the installation of one sill breach: 80m, invert at -0.5mMHW (MHW = .66mNN). As part of this scheme there was the excavation of dumped dredge spoil (370.000 m³).